<table border=

Main Tasks

Excavate 5.7 km of trench and install high pressure gas pipeline. 

 

Summary

This project was proposed to increase the supply of natural gas to the Caltex Oil Refinery as an extension of the Roma to Brisbane Pipeline (RBP), with the intended route running along areas of very heavy traffic and environmentally sensitive sites.  


The design included 5.7 km of DN200, and 9.6 mm WT X52 steel pipeline, this included 3.6 km open trench installation and 5 horizontal direction drills—the longest being 822 metres. With an operating pressure of 9600 kPa and test pressures of up to 21500 kPa, significant quality controls were required to achieve demanding pipeline operating requirements.

 

Client:
APA Group
Location:
East Brisbane, QLD
Time Frame:
August 2010-February 2011
Value:
$3.3 million

" width="800" height="400" />
<table border=

Main Tasks

Excavate 5.7 km of trench and install high pressure gas pipeline. 

 

Summary

This project was proposed to increase the supply of natural gas to the Caltex Oil Refinery as an extension of the Roma to Brisbane Pipeline (RBP), with the intended route running along areas of very heavy traffic and environmentally sensitive sites.  


The design included 5.7 km of DN200, and 9.6 mm WT X52 steel pipeline, this included 3.6 km open trench installation and 5 horizontal direction drills—the longest being 822 metres. With an operating pressure of 9600 kPa and test pressures of up to 21500 kPa, significant quality controls were required to achieve demanding pipeline operating requirements.

 

Client:
APA Group
Location:
East Brisbane, QLD
Time Frame:
August 2010-February 2011
Value:
$3.3 million

" width="800" height="400" />
<table border=

Main Tasks

Excavate 5.7 km of trench and install high pressure gas pipeline. 

 

Summary

This project was proposed to increase the supply of natural gas to the Caltex Oil Refinery as an extension of the Roma to Brisbane Pipeline (RBP), with the intended route running along areas of very heavy traffic and environmentally sensitive sites.  


The design included 5.7 km of DN200, and 9.6 mm WT X52 steel pipeline, this included 3.6 km open trench installation and 5 horizontal direction drills—the longest being 822 metres. With an operating pressure of 9600 kPa and test pressures of up to 21500 kPa, significant quality controls were required to achieve demanding pipeline operating requirements.

 

Client:
APA Group
Location:
East Brisbane, QLD
Time Frame:
August 2010-February 2011
Value:
$3.3 million

" width="800" height="400" />
<table border=

Main Tasks

Excavate 5.7 km of trench and install high pressure gas pipeline. 

 

Summary

This project was proposed to increase the supply of natural gas to the Caltex Oil Refinery as an extension of the Roma to Brisbane Pipeline (RBP), with the intended route running along areas of very heavy traffic and environmentally sensitive sites.  


The design included 5.7 km of DN200, and 9.6 mm WT X52 steel pipeline, this included 3.6 km open trench installation and 5 horizontal direction drills—the longest being 822 metres. With an operating pressure of 9600 kPa and test pressures of up to 21500 kPa, significant quality controls were required to achieve demanding pipeline operating requirements.

 

Client:
APA Group
Location:
East Brisbane, QLD
Time Frame:
August 2010-February 2011
Value:
$3.3 million

" width="800" height="400" />

Caltex Lateral Pipeline

Main Tasks

Excavate 5.7 km of trench and install high pressure gas pipeline. 

 

Summary

This project was proposed to increase the supply of natural gas to the Caltex Oil Refinery as an extension of the Roma to Brisbane Pipeline (RBP), with the intended route running along areas of very heavy traffic and environmentally sensitive sites.  


The design included 5.7 km of DN200, and 9.6 mm WT X52 steel pipeline, this included 3.6 km open trench installation and 5 horizontal direction drills—the longest being 822 metres. With an operating pressure of 9600 kPa and test pressures of up to 21500 kPa, significant quality controls were required to achieve demanding pipeline operating requirements.

 

Client:
APA Group
Location:
East Brisbane, QLD
Time Frame:
August 2010-February 2011
Value:
$3.3 million

Diona